Ghaziabad-based EMS Limited has emerged as the lowest bidder (L-1) for a ₹1.91 billion water supply project in Kota, awarded by PHED Rajasthan under AMRUT 2.0. The scope includes a 100 MLD water treatment plant, reservoirs, and pipeline networks to be built over 24 months, followed by 5 years of operations.
KOTA / GHAZIABAD — Water and wastewater infrastructure solutions provider EMS Limited has emerged as the lowest bidder (L-1) for a major municipal water supply project in Kota, Rajasthan, valued at approximately ₹1.91 billion (₹190.86 crore).
The Public Health Engineering Department (PHED) of the Government of Rajasthan selected EMS Limited to execute the extensive urban water management initiative under the Central Government’s Atal Mission for Rejuvenation and Urban Transformation (AMRUT 2.0) scheme. The development significantly strengthens the company's order pipeline in municipal water treatment and distribution infrastructure across northern India.
Following the announcement on Wednesday, August 19, 2026, shares of EMS Limited reacted positively on the National Stock Exchange (NSE), closing 4.91% higher at ₹394.20.
Technical Scope and Project Execution Details
According to regulatory filings submitted by the company, the contract encompasses the comprehensive construction of a 100 Million Litres per Day (MLD) capacity water treatment plant near Shivaji Park in Kota.
The technical scope of the project includes:
Storage & Transmission Systems: Construction of an 800-kilolitre break pressure tank, a 1,500-kilolitre clear water reservoir, a dedicated pump house, and a 1,500-kilolitre overhead service reservoir near Jind Baba Mandir.
Pipeline Infrastructure: Laying 10,665 meters of clear water rising main using Ductile Iron (DI) K-7 pipes ranging from 200 mm to 700 mm in diameter.
Distribution Network Expansion: Creation of fresh distribution network infrastructure in unserved regions of the Shivaji Park zone, specifically covering Zones 12, 15, and 16 under the Kota North Nagar Nigam, alongside new supply networks in Poonam Colony and J.P. Colony.
The project has a stipulated completion timeline of 24 months from the signing of the contract. Following completion and a mandatory one-year defect liability period, EMS Limited will manage the operation and maintenance (O&M) of the infrastructure for five years.
Expanding Operational Footprint and Revenue Pipeline
The ₹1.91 billion Kota project comes alongside additional contract wins for the Ghaziabad-based engineering, procurement, and construction (EPC) firm. Earlier this week, EMS Limited was awarded L-1 status for a ₹1.29 billion (₹129.80 crore) sewerage rejuvenation project by the Municipal Corporation Jodhpur.
Simultaneously, the National Highways Authority of India (NHAI) designated EMS as the highest bidder (H-1) for user fee collection operations at two toll plazas in Assam and Haryana, valued at a combined ₹422.2 million (₹42.22 crore).
The intake of fresh municipal orders provides key revenue visibility for the company, offsetting execution-linked slowdowns reported in its recent Q1 FY27 financial results, where consolidated quarterly revenue stood at ₹1.57 billion.
Impact on Local Residents and Regional Utilities
For the residents of Kota North, particularly those living in uncovered areas such as Poonam Colony and J.P. Colony, the project promises reliable access to treated drinking water. High-capacity treatment plants combined with modernized DI K-7 distribution networks drastically reduce non-revenue water loss caused by leaks and improve overall supply pressure across urban zones.
For local municipal authorities, expanding public water utility capabilities aligns with state-level mandates under AMRUT 2.0 to deliver clean drinking water to rapidly expanding suburban and urban clusters.
Official Sources Section
The information detailed in this report has been compiled directly from corporate regulatory disclosures filed with Indian stock exchanges (NSE and BSE) by EMS Limited, as well as project tender notifications issued by the Public Health Engineering Department (PHED), Government of Rajasthan.
Quote Section
According to official company regulatory disclosures:
"EMS Limited has emerged as the lowest bidder (L-1) for the work of construction of 100 MLD WTP and associated water infrastructure under the Augmentation of Urban Water Supply Scheme Kota-North. The project is subject to the formal receipt of the Letter of Award (LoA) from the Public Health Engineering Department, Rajasthan."
Why It Matters
Clean water distribution remains a primary development goal across urban Rajasthan. By securing large-scale EPC orders under government schemes like AMRUT 2.0, EMS Limited bolsters its position in the municipal water management industry. For investors, the new order wins stabilize the order book and provide visible multi-year cash flow streams via long-term operation and maintenance terms.
Key Facts at a Glance
Total Contract Value: Approximately ₹1.91 billion (₹190.86 crore) including GST.
Awarding Authority: Public Health Engineering Department (PHED), Rajasthan, under AMRUT 2.0.
Core Deliverable: 100 MLD Water Treatment Plant and accompanying distribution network in Kota.
Execution Period: 24 months, followed by 5 years of operation and maintenance.
Market Response: EMS Limited shares rose 4.91% to close at ₹394.20 on the NSE following the news.
Frequently Asked Questions (FAQ)
What is the value of the order received by EMS Limited?
EMS Limited has emerged as the lowest bidder (L-1) for a project valued at approximately ₹1.91 billion (₹190.83 crore to ₹190.86 crore).
Who awarded the project to EMS Limited?
The contract was issued by the Public Health Engineering Department (PHED) of Rajasthan under the AMRUT 2.0 urban infrastructure program.
Where will the project be executed?
The water treatment plant and pipeline distribution work will take place in Kota North, Rajasthan, covering zones including Shivaji Park, Poonam Colony, and J.P. Colony.
What is the timeline for completion?
The construction work must be completed within 24 months, followed by a 1-year defect liability period and 5 years of operation and maintenance.
Source: Official company disclosures to stock exchanges (BSE/NSE), Public Health Engineering Department (PHED) Rajasthan releases.