Sarda Energy & Minerals Ltd has obtained approval for a coal handling plant capable of processing 1.8 million metric tonnes annually. This development strengthens its integrated coal and mineral operations, supporting power generation and steel manufacturing capacities amidst expanding sector demands.
Sarda Energy & Minerals Limited (SEML), a key player in integrated steel, mining, and power sectors, has secured official approval for a coal handling plant with an annual capacity of 1.8 million metric tonnes. This advancement bolsters the company’s strategy to enhance raw material self-sufficiency and operational efficiencies in its mining and power production activities.
The coal handling plant will cater to SEML’s expanding captive coal and power requirements, aligning with its broader vision of optimizing the supply chain and minimizing logistic bottlenecks. The plant’s capacity aims to meet growing demand from SEML’s steel manufacturing and ferroalloy production facilities, thereby sustaining robust output levels and cost competitiveness.
SEML’s mining portfolio includes multiple coal blocks in Raigarh, Chhattisgarh, and Madhya Pradesh, where ongoing production ramp-up and new mine developments underpin its raw material strategy. The coal handling plant approval complements SEML’s existing infrastructure, including captive thermal power plants and eco-friendly initiatives such as fly-ash based bricks.
Major Takeaways:
-
Approval granted for coal handling plant with 1.8 million metric tonnes annual capacity.
-
Plant supports SEML’s integrated supply chain in coal mining, steel manufacturing, and power generation.
-
Enhances company’s raw material self-sufficiency amid expansion of coal mining operations.
-
SEML operates multiple coal mines including Gare Palma IV/7 and Sahapur West with ongoing development plans.
-
Coal handling plant aligns with environmental initiatives and cost efficiency goals.
-
The facility strengthens SEML’s competitive positioning in the steel and ferroalloy markets.
Important Points:
-
The coal handling plant approval represents a strategic milestone supporting SEML’s production scalability.
-
Integrated operations spanning coal mining, power generation, and steel production ensure operational synergies.
-
The company’s focus on eco-friendly practices includes manufacturing bricks using fly-ash from captive power plants.
-
Continued capacity expansion in mining and power segments positions SEML for sustained growth.
-
Approval advances SEML’s agenda for full raw material integration and long-term sustainability.
Sources: Reuters, Market Screener, SEML official website, TradingView, Business Standard